Sewer Connections Knowledge Hub

Clear, practical answers on new sewer connections, Section 106 applications, costs, timescales and compliance, from the UK specialists.

Trusted by Builders, Developers, and
Homeowners Nationwide

Accredited Contractor

Accredited Contractor

Fully Insured

Fully Insured

100% Compliant

100% Compliant

NADC Accredited
British Safety Council
RoSPA Member
Constructionline Gold Member
CHAS Elite
Severn Trent Approved
BSI Certification

EXPLORE OUR GUIDES & SERVICES

Browse by Topic

Comprehensive technical resources, regulatory breakdowns, and step-by-step guidance for drainage and connection projects.

KNOWLEDGE BASE

Featured Guides

Expert insights, technical advice, and step-by-step guidance to help you navigate UK drainage and sewer regulations smoothly.

The Complete Guide to New Sewer Connections in the UK

Everything developers, builders, and property owners need to know about planning, approvals, and connecting to the public sewerage network.

What Is a Section 106 Application and Do You Need One?

Understand the legal requirements under the Water Industry Act 1991, the statutory review process, and how to secure statutory approval smoothly.

How Much Does a Sewer Connection Cost?

A comprehensive cost breakdown of water authority application fees, contractor excavation, road opening permits, and direct vs indirect connection costs.

KNOWLEDGE BASE & GUIDES

Latest Articles & Technical Insights

Essential guidance, regulatory frameworks, and practical comparisons for civil engineers, developers, and drainage specialists.

LEGAL & ADOPTION

Section 106 vs Section 104

A comprehensive comparison between sewer connection rights under S106 and formal sewer adoption agreements under S104 of the Water Industry Act 1991.

⏱ 6 min read

ENGINEERING DESIGN

Foul vs Surface Water Drainage

Key hydraulic principles, separation mandates, discharge hierarchy rules, and how to avoid cross-contamination in new residential layouts.

⏱ 5 min read

HIGHWAYS & INFRASTRUCTURE

Navigating Section 278 Agreements

Step-by-step guidance on securing Highway Authority approvals, managing technical audits, and bond calculations for off-site junction works.

⏱ 7 min read

SUSTAINABLE DRAINAGE

SuDS Design for Tight Urban Sites

Innovative attenuation cells, blue-green roofs, and permeable pavements that meet LLFA discharge requirements without sacrificing parking space.

⏱ 4 min read

RISK MANAGEMENT

Flood Risk Assessments: Zones 2 & 3

How to navigate sequential testing, climate change peak flow allowances, and Environment Agency objections during the planning stage.

⏱ 8 min read

STATUTORY UNDERTAKINGS

Water Authority Vesting Declarations

Demystifying Section 102 adoption appeals, statutory vesting mechanisms, and hand-over protocols for legacy drainage infrastructure.

⏱ 5 min read

SURVEYING & AUDITING

CCTV Drain Surveys & WRc Standards

Interpreting defect classifications, grade 4/5 structural failures, and remediation strategies before pre-adoption sign-offs.

⏱ 6 min read

ENVIRONMENT & WATERWAYS

Riparian Rights & Watercourse Consent

Legal land drainage liabilities, ditch clearing responsibilities, and securing Section 23 consent from Lead Local Flood Authorities.

⏱ 5 min read

ECOLOGY & NET GAIN

Biodiversity Net Gain in Drainage

How integrating wet attenuation ponds, reed beds, and vegetated swales delivers the mandatory 10% statutory BNG requirement.

⏱ 6 min read

Complete Sewer Connection Services
— We Handle Everything

New Sewer Connections

New Sewer Connections

For domestic and commercial properties

Section 106 Applications

Section 106 Applications

Submitted and managed on your behalf

Design & Planning

Design & Planning

Including CAD drawings and compliance checks

Installation & Testing

Installation & Testing

Certified, safe, and regulation-approved

Adoption Support (Section 104)

Adoption Support (Section 104)

For private-to-public sewer adoption

How It Works—We Make It Simple

Step 1: Request a Quote

Request a Quote

Fill in our form or call us for a free consultation

Next step
Step 2: We Handle the Paperwork

We Handle the Paperwork

Applications, permissions, and planning

Next step
Step 3: Installation Completed

Installation Completed

Fully approved and ready for connection

WHAT OUR CLIENTS SAY

Quote

“Brilliant from start to finish—sorted out all the red tape for us and kept the project on track.”

— James T., Property Developer

Quote

“Fast and professional. I wouldn’t use anyone else for sewer connections.”

— Sarah H., Self-Builder

Quote

“They handled everything—from permits to final inspection. Stress-free and ahead of schedule.”

— Mark L., Homeowner

Why SewerConnections.co.uk?

We Save You Time

We Save You Time

No chasing water companies or engineers

We Save You Money

We Save You Money

Transparent pricing with no hidden fees

We Get It Done Right

We Get It Done Right

Full compliance guaranteed

We're Easy to Work With

We're Easy to Work With

Clear communication and fast responses

Get a Fast,
No-Obligation Quote Today

Tell us a bit about your project
and one of our specialists will be in touch
within 24 hours.

Your data is 100% secure. We never spam.

Frequently Asked Questions

When do I need to apply for a sewer connection?

You should apply as early in your project planning as possible, ideally before starting groundworks. You must secure formal statutory approval under Section 106 of the Water Industry Act 1991 from your regional water authority before any physical connection can be made to the public sewer network.

What's the difference between private and public sewer connections?

A private drain serves only your property and remains the property owner's responsibility. A public sewer is owned, maintained, and insured by the regional water authority (e.g. Severn Trent, Thames Water, United Utilities). Making a connection from a private drain into the public sewer requires formal consent and compliance with national technical standards.

How do I apply for a connection to the public sewer?

You submit a Section 106 application to your local water authority accompanied by site location plans, detailed drainage design calculations, and the statutory fee. We manage the entire application and approval process on your behalf to guarantee swift, compliant approval without bureaucratic delays.

What permissions or consents do I need before starting work?

Depending on the route of the connection, you will need: Section 106 approval from the water company, a Section 50 Street Works Licence from the local highways authority if working in a public road/pavement, building control approval, and legal easements/consent if crossing third-party private land.

What costs are involved in a sewer connection?

Costs generally comprise water authority application and inspection fees, council highway opening licences (Section 50) and traffic management where applicable, physical excavation, pipe installation, connection, and reinstatement. We provide transparent, fully itemised fixed quotes with zero hidden extras.

How long does the sewer connection process usually take?

Statutory water company approval typically takes 15 to 21 working days. If road opening licences (Section 50) are required, councils typically require 4 to 8 weeks advance notice. The physical groundwork and connection usually takes 1 to 5 working days depending on ground conditions and depth.

What happens after the works are completed?

Following installation, the water undertaker or an accredited inspector performs an on-site or CCTV inspection. Upon successful sign-off, a formal completion certificate is issued, confirming your drainage is fully approved, compliant, and connected.

Who is responsible for maintenance after connection?

The property owner is responsible for maintaining the private drains inside their boundary. Once the pipe reaches the adopted public sewer or lateral drain boundary, ongoing maintenance is the statutory responsibility of the regional sewerage undertaker.

What if the connection involves breaking into a public road or pavement?

Works in the public highway require fully qualified NRSWA-accredited operatives, an approved Section 50 licence from the local authority, certified traffic management, and compliant highway reinstatement. Our team handles all highway licensing and execution safely and legally.

What happens if the work is delayed or inspected and there are defects?

All work must meet strict national standards (Sewers for Adoption / Design and Construction Guidance). As experienced specialist contractors, our 100% compliance guarantee ensures every installation passes inspection first time without costly rectifications or delays.

Can existing buildings with no sewer access be connected?

Yes. If your property currently uses a septic tank, cesspit, or package treatment plant, we can survey the route to the nearest public sewer, assess falls and invert levels, and design either a gravity connection or a pumped system to connect your property to mains drainage.